What you actually get:
the analysis and the court bundle.
A homeowner pays £5,400 for a bathroom refit and the new shower leaks through the kitchen ceiling. Below is the complete comprehensive AI analysis and the 46-page court bundle the £49 toolkit produced for that case, shown in full so you can judge the quality before you pay.
Illustrative example: a fictional case, not a real customer and not a real outcome. The names, firms, dates and figures are invented.
Jump to: the analysis · the court bundle · what each product includes
Priya Castellane v Okehollow Bathrooms Ltd
A consumer claim against a tradesperson for poor workmanship. Chosen because it exercises every part of the toolkit, from the Consumer Rights Act 2015 analysis to a defended claim with a hearing.
What happened. In January 2026 Priya Castellane accepted a written quotation from Okehollow Bathrooms Ltd for a full bathroom refit, including waterproof tanking of the shower. She paid in full. Two weeks after the work was signed off, water came through the kitchen ceiling. The fitter re-sealed the tray; the leak came back. He blamed her for using the shower before the silicone had cured, offered one more re-seal, and then stopped replying.
The evidence. An independent plumber found no tanking behind the tiles, a shower tray unsupported along one edge and a leaking waste joint. A tiler quoted £3,650 to put it right. She sent a letter before claim, was offered £800, refused it, issued the claim, received a defence, went to small claims mediation without agreement, and now has a hearing date.
Where the toolkit comes in. She uploaded ten documents (below). The workspace analysed each one, then ran the comprehensive analysis you can read in full further down. The witness statement and the bundle were built from the same case file.
| Contract price paid for the bathroom refit | £5,400 |
| Quotation to strip, tank, re-bed and re-tile the shower | £3,650 |
| Independent inspection report | £140 |
| Amount claimed | £3,790 |
| Court issue fee (Claims £3,000.01 to £5,000) | £205 |
| Small claims hearing fee | £346 |
| Interest claimed under s.69 County Courts Act 1984 | 8% a year |
Court fees are the HMCTS EX50 fees computed by the same code the product uses; check the current fee on GOV.UK before you file. Interest is claimed, not guaranteed; a judge decides whether to award it.
The 10 documents uploaded to the workspace
- ✓Quotation Q-0117 from Okehollow Bathrooms Ltd (signed acceptance)okehollow-quotation-Q-0117.pdf
- ✓Bank statement extract showing payments to the Defendant and for the inspectionbank-statement-extract-payments.pdf
- ✓Photograph: water staining to kitchen ceiling below the shower, 21 March 2026photo-kitchen-ceiling-21-mar-2026.jpg
- ✓Photograph: gap at rear edge of shower tray and bare plasterboard behind removed tile, 14 April 2026photo-shower-tray-rear-edge-14-apr-2026.jpg
- ✓Email chain between the Claimant and Daniel Okehollow, 3 March to 2 April 2026email-chain-okehollow-mar-apr-2026.pdf
- ✓Inspection report of Bramley Plumbing Services, 14 April 2026bramley-plumbing-inspection-report-14-apr-2026.pdf
- ✓Invoice 2026-0231 from Bramley Plumbing Services for the inspection, £140bramley-plumbing-invoice-2026-0231.pdf
- ✓Remedial works quotation FT-2041 from Fennimore Tiling & Plumbing, £3,650fennimore-remedial-quotation-FT-2041.pdf
- ✓Claim form and particulars of claim, issued 15 June 2026particulars-of-claim-15-jun-2026.pdf
- ✓Defence of Okehollow Bathrooms Ltd, filed 10 July 2026defence-okehollow-10-jul-2026.pdf
The whole analysis, exactly as the workspace shows it.
This is the real output. The case file above was fed to the same prompts and the same model (claude-opus-5-5) that run when a toolkit user clicks “Generate analysis”, and the result is rendered with the same components. We corrected two citations by hand and softened three sentences that read as predictions; nothing else was edited. The grey panels are the product; the coral notes are ours, explaining what each section is for. It is long, so most parts start folded: open the ones you want, or expand all.
The analysis was run before the witness statement was written, which is why the checklist still lists it as not started. On a real case you regenerate the analysis as the file grows.
What this part is for
The centrepiece: a plain-English explanation of where the case stands, what the other side will say, and what to do next, citing the actual documents and the law that applies. On a real case this is generated from your uploaded evidence, your correspondence and any defence.
AI Legal Assessment
AI-generated analysis in plain English, not legal advice
Key Takeaways
- Okehollow's own signed quotation required tanking; the photo shows bare plasterboard, so this is a breach of contract and of ss.49-50 CRA 2015
- Three separate defects were found, and two of them (waste joint, unsupported tray) cannot be explained by uncured silicone
- The 25 March email offering access, and the Defendant's silence, answer the 'refused a further visit' argument
- Urgent: secure permission under CPR 27.5 to rely on the Bramley report, or have Mr Bramley attend as a witness of fact
- Get a second remedial quote to defend the £3,650 figure against the Defendant's £600 estimate
- Offer the Defendant a pre-hearing inspection and ask for its tanking product receipts
- A realistic outcome is about £3,300-£3,790 plus interest and court fees; settle only at about £3,000 or more
What this part is for
Two scores. Confidence is how firmly the analysis stands behind its view. Preparation is how complete your documents and case readiness are, which is the number you can move.
AI Legal Assessment
Generated 2 Sept • 10 documents analysed
What this part is for
Once a defence has been filed the analysis models the defendant’s case: each argument, how strong it is, and a counter-strategy drawn from your own documents.
Opponent’s Likely Strategy
What the defendant will argue and how to counter
Their Argument:
Leak caused by the Claimant using the shower before the silicone cured
Your Counter-Strategy:
The leak recurred after the Defendant's own re-seal; the waste joint and tray movement are unrelated to silicone; witness statement confirms 48 hours of non-use
Their Argument:
Tanking paint was applied and the tray was bedded on mortar
Your Counter-Strategy:
Photo of bare plasterboard and a measured tray gap; demand product receipts; offer inspection; any mortar bed was evidently inadequate given the 2-3mm movement
Their Argument:
The Claimant refused the further visit offered on 24 March
Your Counter-Strategy:
The 25 March email offered access for investigation and was ignored; the visit offered was a repeat of a failed fix; s.56 CRA 2015; the Geest burden is on the Defendant
Their Argument:
The inspection was one-sided and the Defendant was not invited
Your Counter-Strategy:
The 2 April email gave notice; offer a joint or Defendant inspection now; seek CPR 27.5 permission; Bramley attends
Their Argument:
£3,650 is excessive; the repair costs about £600
Your Counter-Strategy:
Second quote; map each line to a defect; the £600 figure ignores tanking, strip-out and the ceiling; Ruxley reasonableness
What this part is for
A one-line recommendation, then two to four options with their pros, cons, timeline and cost, so the decision is yours and informed.
Recommended Next Step
Prepare to proceed with your court claim
Prepare for the 24 November 2026 hearing while keeping settlement open
Treat the hearing as going ahead. Fix the evidential gaps: get a second remedial quote, sort out expert evidence permission or have Mr Bramley attend, offer the Defendant a pre-hearing inspection, and serve a tight bundle. Leave the door open to a realistic offer.
Advantages
- •The signed quotation expressly required tanking, and the photos and report show none behind the removed tile
- •The leaking waste joint and unsupported tray cannot be explained by uncured silicone
- •The email chain undermines the 'refused further visit' defence
- •Court fees are recoverable on success under CPR 27.14
Considerations
- •Hearing fee of about £346 is payable before the hearing
- •Time to prepare a witness statement and bundle
- •The judge may trim quantum for betterment or because there is only one quote
- •Some risk if the Bramley report is given limited weight without expert permission
Make a without prejudice save as to costs offer before the hearing
Put a written offer to settle at around £3,300-£3,500 plus court fees, open for 14 days. This tests whether the £800 'goodwill' figure was a starting point.
Advantages
- •Could avoid the hearing fee if accepted before it falls due
- •Gives certainty and quicker payment
- •An unreasonable refusal can support an argument under CPR 27.14(2)(g)
Considerations
- •Part 36 does not apply on the small claims track (CPR 27.2), so the costs leverage is limited
- •The Defendant's previous conduct suggests a low acceptance rate
- •May signal a willingness to discount
Accept a supervised repair by the Defendant
Allow the Defendant to carry out full strip-out, tanking, tray re-bedding and waste remaking, inspected by an independent tradesperson, plus payment of the £140 report and the ceiling repair.
Advantages
- •Mirrors the s.55 CRA 2015 repeat performance remedy
- •May appeal to a Defendant reluctant to pay cash
Considerations
- •Trust has broken down after two failed or abandoned attempts
- •Risk of further poor workmanship and disputes over sign-off
- •The Defendant has never admitted the real defects, so it is unlikely to do the work properly
What this part is for
Which documents carry the case, which are vulnerable and why, and what is missing, with how to get it. This is the list most people act on first.
Evidence Assessment
Strong evidence (5)
- okehollow-quotation-Q-0117.pdf — Signed express term requiring tanking and tested plumbing
- photo-shower-tray-rear-edge-14-apr-2026.jpg — Shows bare plasterboard and the tray gap
- bramley-plumbing-inspection-report-14-apr-2026.pdf — Identifies three defects and rejects the silicone explanation
- email-chain-okehollow-mar-apr-2026.pdf — Prompt reporting, offer of access and the Defendant's silence
- bank-statement-extract-payments.pdf — Proves full payment and the £140 fee
Weak evidence (2)
- fennimore-remedial-quotation-FT-2041.pdf — Single quote; possible betterment via backer board
- bramley-plumbing-inspection-report-14-apr-2026.pdf — Party-instructed, no expert permission yet, Defendant absent
Missing evidence (5)
- Court permission to rely on the expert report, or Mr Bramley's attendance — How to obtain: Check the directions; write to the court or file N244; ask Mr Bramley to attend or provide a signed witness statement of fact(CRITICAL)
- Second remedial quotation — How to obtain: Invite another tiling or plumbing firm to quote against the Bramley report scope, itemised(CRITICAL)
- Claimant's witness statement with a statement of truth — How to obtain: Draft a chronological account, including that the shower was unused for 48 hours before 3 March(CRITICAL)
- Defendant company background (Companies House, Registry Trust CCJ search) — How to obtain: Free Companies House search; Registry Trust search for a small fee(HELPFUL)
- Written offer of inspection to the Defendant and its reply — How to obtain: Email and post a letter now with specific dates(HELPFUL)
What this part is for
The statutes and rules behind the assessment, each with a one-line explanation of why it matters here. Check them: the sections are real and the point of citing them is so you can.
Legal Foundation (Citations)
6 relevant statutes
Duty to perform the service with reasonable care and skill
What this part is for
Planning tools, not predictions: the ranges a settlement might land in and what would have to be true for each. Useful before mediation and before any offer.
Defendant raises offer modestly
PossibleOkehollow increases from £800 to around £1,500-£2,000 when faced with the second quote and hearing fee
Conditions That May Lead to This Scenario
- •Second quote served
- •Hearing fee approaching
Realistic compromise
Less LikelySettlement close to the Claimant's bottom line
Conditions That May Lead to This Scenario
- •Expert permission granted
- •Defendant declines inspection or finds no tanking
Full payment before hearing
Less LikelyDefendant pays the claim plus fees to avoid a public judgment
Conditions That May Lead to This Scenario
- •Defendant's own inspection confirms no tanking
What this part is for
What still needs doing before the hearing, in order of importance. In the workspace these feed the task list, the witness statement builder and the court bundle.
Overall readiness: adequately-prepared
Expert permission or Bramley attendance
criticalResolve within 7 days
Second remedial quote
criticalItemised, same scope
Witness statement
criticalInclude the 48-hour non-use and the 25 March offer
Hearing fee paid
criticalAbout £346 by the notice date
Paginated bundle served
importantUsually 14 days before the hearing
Schedule of loss with interest
important£3,790 plus £0.83 per day from 22 April 2026
Inspection offer to Defendant
importantSpecific dates in writing
Core documents and photos
criticalAlready strong
Legal Disclaimer: This AI-generated analysis is for informational purposes only and does not constitute legal advice. Settlement scenarios and timelines are planning tools, not predictions. Consult with a qualified solicitor for advice on your specific situation.
A 46-page bundle, indexed, lettered and paginated.
The bundle builder takes the approved documents, the letters, the witness statement and the dated events from the case file and assembles them in the order a district judge expects: cover page, case summary, index, chronology, mediation record, then the documents in five lettered sections. Every document gets a tab reference ([E11], [D5]) that the witness statement and the chronology use, so the judge can find anything in seconds. The PDF below is the generator’s output printed from the browser; the workspace also exports it as Word.






What is in it
- ✓Cover page with the parties, claim number, track and amount
- ✓Court details, a neutral case summary and the order sought
- ✓Index of every document, lettered by section, with tab references
- ✓Consolidated chronology, each event tied to its document
- ✓Mediation record (CPR 26.4A)
- ✓Section A Pleadings: claim form, particulars and the defence
- ✓Section B Witness statement in CPR Part 32 form
- ✓Sections C to E: mediation, correspondence (letter before claim and the reply), evidence with photographs and the searchable text of each document
- ✓Pre-action compliance statement and a statement of truth to sign
Sample bundle · PDF · 46 pages
Read the whole thing
Open it the way a judge would: start at the index, follow a tab reference from the witness statement, check the chronology against the emails. The two photographs are illustrative images, not real photos.
Download the sample bundle (PDF)Illustrative example. Priya Castellane, Okehollow Bathrooms Ltd, the tradespeople named and the claim number are fictional. Any resemblance to a real person or business is coincidental.
Two products. Only one includes the analysis and the bundle.
Step 1 · before a claim is defended
Claim Pack
£29 one claim, one-off
- ✓Letter before claim under the right pre-action rules
- ✓Interest and court-fee statement
- ✓Particulars of claim and the N1 claim form, filled in
- ✓Deadline tracking and Word downloads
Does not include the comprehensive analysis, evidence upload, the witness statement or the court bundle shown on this page. If the claim is defended, the £29 is credited against the toolkit for 60 days.
Step 2 · what this page shows
Small claims toolkit
£49 one case, one-off
- ✓Everything in the Claim Pack
- ✓Document upload with per-document AI analysis
- ✓The comprehensive AI analysis, regenerated as the case develops
- ✓Witness statement in CPR form
- ✓The court bundle, as PDF (print) and Word
- ✓Hearing preparation and the case assistant chat
Bought after the free check, so the workspace opens with your facts already in it. If, within 14 days of purchase, a document we generate fails a procedural check, we fix it free or refund you in full.
CourtPilot is not a law firm, is not regulated by the Solicitors Regulation Authority and does not act for you. The analysis and documents are information and document-preparation tools, not legal advice. Every case turns on its own facts: the analysis, scores and settlement ranges shown here belong to this fictional case and say nothing about yours. You conduct your own claim, in your own name, and you are responsible for checking every date, figure and document before you send or file it.